HADLEY PARK AQUATIC AND
COMMUNITY CENTER
Miami, Florida
Johnson, Avedano, Lopez, Rodriguez & Walewski Engineering Group provided the Mechanical and Electrical Engineering and the Lighting Design for this Olympic Size Swimming Pool, with a 5-meter tower and two 3-meter platforms, as well as the design for a 7,500 SF bathhouse, which included a Team Room, Locker Rooms and Offices.
This project also included design of spectator facilities, support spaces and a 25,000 square foot Community Center that contains a fully equipped athletic-fitness center; a 250-seat black box theater with retractable seating and stage; two dance studios with professional dressing rooms; a fully-equipped concession stand and a large conference room with adjacent multipurpose rooms.
OWNER: City of Miami
ARCHITECT: Thaddeus Cohen